Top Stocks
Fetching live market data...
Fingo
Corporates

Acme Solar Commissions Additional 34.598 MW BESS Capacity in Rajasthan

2 min read
Sneha Ulghate
27 May 2026 at 9:16 pm
2 min read

Acme Solar Holdings Limited has commissioned an additional 34.598 MW / 155.493 MWh capacity of its Battery Energy Storage System (BESS) project located at Jaimalsar village in the Bikaner district of Rajasthan. The capacity was commissioned on May 27, 2026 through ACME Solar's wholly owned subsidiary, ACME Surya Power Private Limited. The BESS project is a standalone battery storage facility developed by Acme Solar.

The commercial operation date for the newly commissioned BESS capacity has been set as May 29, 2026. ACME Solar had previously informed the stock exchanges on May 11, 2026 about the development of this BESS project at the same location in Rajasthan.

With the latest commissioning, ACME Surya Power Private Limited has achieved a cumulative commissioned capacity of 245.536 MW / 1103.392 MWh at the Bikaner site. The newly added BESS capacity comprises 34.598 MW of power capacity and 155.493 MWh of energy storage capacity.

ACMESOLAR disclosed the information to BSE and NSE under Regulation 30 of the SEBI Listing Obligations and Disclosure Requirements Regulations, 2015. The regulatory filing was signed by Rajesh Sodhi, Company Secretary and Compliance Officer of Acme Solar Holdings Limited.

Acme Solar Holdings Limited develops and operates renewable energy assets across India. Acme Solar's equity shares are listed on BSE under scrip code 544283 and on NSE under the symbol ACMESOLAR.

Disclaimer: This article is based on company filings submitted to the Bombay Stock Exchange (BSE) and National Stock Exchange of India (NSE) and is for informational purposes only. It does not constitute investment advice or a recommendation. Investors should conduct their own research and consult a qualified financial advisor before making investment decisions.

Public Tags